Box Clever Public/Commercial Projects

caddick-Farington-site.jpg

Client : Caddick Developments Limited

Project : Farington Park
Value : £30M
Lead: Cameron Wilson
Date: October 2021

About: A large scale industrial park, with direct links to the M61, M65 & M6, offering over 500,000sq ft of warehouses and industrial space, a cycleway to connect it to the Leyland loop, and an eight-acre recreational area.

Clever thinking: We have offered initial advice on programming, phasing and cost analysis to inform the initial masterplan options. We have reviewed and developed several potential phasing options in line with Caddick Developments Limited’s market led requirements. Identifying key issues on a regular basis and de-risking the project at the front end has enabled a more robust set of cost data to be produced prior to major detailed design.

Value added: Box Clever has utilised the experience within the business to mitigate key risks at the front end of the project. The team have bought experience and rigour to the Stage 3 design stage and main contractor procurement process in support of the funding process.


Client : Caddick Developments Limited

Project : SoYo – MSCP
Value : £7.5M
Lead : John Murphy
Date : On site August 2021 – April 2022

About: A 610-space multi-storey car park, with a high-quality envelope and state-of-the-art car park management systems.

Clever thinking: We developed a phasing plan which allowed the car park to open early for contractor use during construction of other phases, allowing the client to earn additional revenue from a land-locked site.

Value added: Box Clever sourced a specialist car park contractor from Germany, who was able to offer a faster programme and over £1m in savings against traditional UK construction methods.


Client : University of Bolton

Project : Bolton Institute of Medical Sciences
Value : £27M
Lead : John Murphy
Date : On site August 2022 – April 2024

About: A new 6,250m2 medical sciences building for the University of Bolton and Bolton NHS Foundation Trust. It provides state-of-the-art clinical training suites, classrooms, a 120-seater lecture theatre in the round, a cafe and library.

Clever thinking: The focus from the very earliest stage was on the quality and performance of the finished building. This started at Stage 1 contractor briefings, and was a key criterion in selecting the main contractor and supply chain. A consistent focus on details, specification, materials and workmanship (including having a dedicated clerk of works) meant the finished product is completed to an exceptionally high standard.

Value added: As one of the first round of Levelling Up projects, we committed to completing the build in early 2024 and within budget. Both targets were achieved in April 2024, and the project has been cited in Parliament as an exemplar for the programme.


Client : Hunter REIM

Project : Teville Gate House
Value : £30m (Build Cost)
Lead : Justin Myall
Date: Completed: May 2021

About: Creation of a new 100,000 sqft HMRC Office Hub in Worthing. Enabling Works consisted of the demolition of an existing office block and piling mat. Main Works creating a new office block over 6 storeys with associated car parking 10 no.

Clever thinking: Liaison with HMRC to deliver the completed turnkey development by Dec 2020 meant a more structured and ‘accountable’ procedure so that HMRC stakeholders understood and bought into the deliverables for an AFL to be signed up as quickly as possible (12 weeks).

BCC had to also manage the team as well as the external stakeholders (local authority) to facilitate the submission and approval of planning permission in order to ensure a start onsite that enabled a contract to be signed up to for a 16 month delivery programme.

Value added: Co-ordination of various stakeholders who have their own agendas. Without successfully managing this process the planning, AFL and commencement onsite would not have been signed up and the delivery of the building.


Client: University of Leeds

Project: Nexus, new build innovation & enterprise centre
Value: £30m+
Lead: John Murphy
Date Completed: August 2018

About: A new 10,000m2 office and laboratory building, which provides high-quality serviced space for start-up companies. Situated on a prominent entrance to the campus, the building is a striking, high-quality design, which will be the public face of the University to businesses and investors.

Clever thinking: We developed an innovative, collaborative procurement process that still had to comply with OJEU regulations. This allowed us to get early commitment on cost and programme from contractors, while still maintaining competition. We shared the project budget with tenderers, and they competed on delivering maximum value for that budget.

Value added:  In dialogue with contractors, the foundation design and cladding construction was simplified whilst fully maintaining all the crucial architectural details. The tenderers also identified any gaps in the Employer’s Requirements, so we could resolve those prior to going into contract. 


Client: University of Leeds

Project: Complete refurbishment of a Grade II-listed library
Value: £15m+
Lead: John Murphy
Date Completed: December 2016

About: The Edward Boyle Library is an 11,000m2 Grade II-listed building over 6 floors. The University needed to completely refurbish it to provide a modern, digital learning environment, but couldn’t afford to lose study desks by closing the library during the works.

Clever thinking: We worked closely with contractors to deliver the best possible phasing and buildability. This enabled us to keep the library open during the refurbishment by incorporating an enabling works package to modify the M&E services early.

Value added:  We took six months off the original programme, reducing it from two years to 18 months. As a result of our rigorous ‘quality-first’ approach, the workmanship in the finished building is now a benchmark for the rest of the University. 


Client: HREIM / AIMCO

Project: Exchange Quay
Value: £12m
Lead: Justin Myall – Project Director
Date completed: 2015
 

About: Modernisation of the 434,000 sq ft Exchange Quay office complex in Salford Quays, creating a coherent family of buildings in a waterside setting.
 
Clever Thinking: We worked closely with contractors to deliver the best possible phasing and buildability in a live environment.  We created a new landscaped public realm that had over 500 cars moving within the space daily. 

Value Added:  The new public realm, amenity spaces and refitted offices have created a new welcoming environment which has facilitate the sale of one building and assisting in the significant uptake of the refurbished space.


Client: Heathrow Airport Holdings

Project: Terminal 2A Multi Storey Car Park
Value: £125m+
Lead: Graham Flynn - Project Leader
Date Completed: 2013

About: Delivery of the new terminal 2A Multi Storey Carpark in an exceptionally busy area of this international hub airport, including lead role managing Heathrow’s Operational Readiness programme.

Clever Thinking:  To reduce disruption to the central terminal area and reduce traffic on a very busy airport artery, the project pursued a DfMA agenda with the majority of the infrastructure built from off-site manufactured products. This increased the speed of build and eased logistical problems.

Value Added: This intelligent car park had multiple systems that had to be live tested before being opened to the public. The Operational Readiness programme was a major concern for the client, which resulted the project was being tested for use even before it was finished, helping to ensure a smooth transition at handover.  


Client: MBNA

Project: MBNA Madrid Call Centre
Value: £5m - £10m
Lead: Graham Flynn – Project Manager
Date Completed: 2002

About: Having worked with MBNA on several projects at its Chester, UK headquarters, Graham was asked to oversee the delivery of MBNAs first European call centre in Las Rozas, Madrid to ensure the quality and brand image matched the standards found in UK and US operations.

Clever Thinking: A JV partnership was developed integrating Spanish and UK contractors to maximize the use of local skills while ensuring consistency of MBNAs recognised high quality standards and employing recognised UK contractors where approprite.

Value added: Managing an international team and integrating UK contractors into a live Spanish project took diplomacy and negotiating skills. The fast track project was completed on time to the exacting brand standards required.


Client: Allied London Properties

Project: Spinningfields
Value: £10-15m
Lead: Justin Myall – Project Manager
Date completed: 2002


About: As part of a £500m regeneration of Manchester city centre, the former Magistrate's Court was demolished creating Hardman Square, a new public realm in the centre of the Spinningfields development.

Clever Thinking:  Justin oversaw a team of landscape architects to design a public realm that had longevity and purpose for a diverse cross-section of workers, commuters and visitors, whilst still maintaining a feeling of community.

Value added: By managing competition to ensure the right landscape architect was selected, Justin helped the client create a world class public realm that will allow the design to adapt to the ever changing commercial aspirations of the landlord's team.